McPhail & Sons All articles
Trade Advice

The Clipboard Moment: Checking a Merchant Delivery Before You Sign

McPhail & Sons
The Clipboard Moment: Checking a Merchant Delivery Before You Sign

There is a moment on every delivery when the wagon reverses in, the driver climbs down and hands over a clipboard. Most people glance at the top sheet, scribble something that looks like a signature and get back to the job. Fair enough — you have work to do. But that scribble matters more than it looks. At McPhail & Sons we have been loading wagons since 1952, and we have seen more disputes settled by a clear note at the gate than by a long phone call a week later. This is not about catching anyone out. It is about making the paperwork do its job.

What the note is actually recording

A delivery note is a working record of what left the yard and what was handed over. It should show the date, the delivery address, the vehicle, the product descriptions, quantities, pack counts and — where it matters — grades or sizes. It may also show any agreed placement, such as kerbside, driveway or a named spot on site. It is not an invoice, and it is not a survey report. It is the paper trail behind both.

That distinction matters. The note tells you what the merchant believes has gone out. Your signature tells the merchant that you have received it, or that you have received it with exceptions. Signing is not a confession that everything is perfect. It is confirmation of what you checked and what you flagged. If something is wrong, the note is the place to say so — before the wagon pulls away.

Count what can be counted

Start with the simple stuff. If the note says ten packs of paving, count ten packs. If it says twenty bags of cement, count twenty bags. Check pallet counts, pack counts and any shrink-wrapped bundles. Look at the labels: C16 or C24 timber, treated or untreated, the length and the finish. Bricks should be the type and pack count you ordered. Bagged sands and ballast should be the right product, not a near neighbour from the same bay. You do not need to open every bag, but you should look for tears, damp patches and split seams.

This is easier if someone is ready to meet the wagon. If the site is empty and the driver has to leave the load at the gate, say so when you order. A merchant can plan around a locked gate or a blocked drive. It is much harder to sort out after the event.

Kerbside, doorway or somewhere else

Placement is one of the quietest sources of bad feeling. Many deliveries are kerbside as standard: the wagon gets as close as it safely can, the driver drops the load and away he goes. If you need materials taken through a gate, up a drive or into a specific bay, agree it when you order. Access, overhead cables, soft ground and parked cars all affect what a wagon can do.

If the placement ends up different from what you expected, write it on the note. A pallet left at the gate because the drive was blocked is not a shortage. It is a placement issue, and the note should reflect it. A sentence like ‘left at roadside, drive blocked’ is worth more than a memory of the conversation three weeks later.

Damage and shortages: note it before you sign

Walk round the load before you sign. Look for the obvious: torn bags, cracked paving, bent profiles, wet plasterboard, broken pallets. If you can, photograph the problem before anything is moved. Then write a short, specific exception on the delivery note — for example, ‘two bags cement split’ or ‘one pack paving chipped on corners’. Ask the driver to countersign it if they are willing. Keep your copy.

If part of the load is damaged, you do not usually need to refuse the whole wagon. Accept the sound goods, note the damaged items clearly and ring the branch the same day. Most merchants would much rather hear about it while the wagon is still in the area than discover it on an invoice query a fortnight later. The phrase ‘signed for in good condition’ is very hard to argue with once it is on paper.

A two-minute routine that saves trouble

Have the order or purchase order to hand when the wagon arrives. Meet the driver if you can. Count the packs and pallets against the note. Check the labels and grades on anything that is easy to mix up. Look for damage. Write any exceptions before you sign, not after. Take a photo of the note and the load if something is wrong. Keep your copy somewhere sensible — a folder, a phone photo, a site diary. It sounds fussy. In practice it takes two minutes and saves a lot of head scratching.

If it goes wrong later

Ring the branch with the note number, the date, the product and a photo if you have one. Be specific. ‘Short on bricks’ is harder to act on than ‘note says twelve packs, we counted eleven’. Check the merchant’s terms for reporting times, especially on damages and shortages. A delivery note is not an invoice, but it is the evidence behind one, and a clear exception helps everyone get to the right answer faster.

From our side of the clipboard, we would rather hear at the gate. Drivers are not surveyors, and yards can make mistakes. A family business lives on repeat custom, not on winning arguments about a split bag of cement. The note is there to keep both sides honest. Treat it as a working document, not a receipt you file and forget, and the wagon can leave with everyone knowing exactly where they stand.

All Articles

Related Articles

The Three-Question Phone Call: Understanding Yard Stock, Supplier Orders and the Next Wagon

The Three-Question Phone Call: Understanding Yard Stock, Supplier Orders and the Next Wagon

Pay as You Go or Open an Account? Merchant Credit, Explained Without the Sales Pitch

Pay as You Go or Open an Account? Merchant Credit, Explained Without the Sales Pitch

Spare Parts and Second Chances: The Fix-It Shift on UK Jobs

Spare Parts and Second Chances: The Fix-It Shift on UK Jobs